U.S. Data Center Nodes — Greenwood CRE

U.S. Data Center Node Map

Installed capacity, pipeline & top operators  |  March 2026

Total Installed (MW)
Pipeline (MW)
Major Nodes
Key Utilities

Bubble Size = Installed MW

Installed capacity
Pipeline / under construction
< 500 MW
500–1,500 MW
1,500–3,000 MW
> 3,000 MW

Top 20 Data Center Nodes

Click a node on the map or below for details