U.S. Data Center Node Map
Installed capacity, pipeline & top operators | March 2026
Bubble Size = Installed MW
Installed capacity
Pipeline / under construction
< 500 MW
500–1,500 MW
1,500–3,000 MW
> 3,000 MW
Top 20 Data Center Nodes
Click a node on the map or below for details